HomeFeaturesScheduling
Scheduling

Replace Whiteboards, Spreadsheets, and Scheduling-by-Memory

OpenSpindle gives your shop a live operational schedule across projects, machines, staff, and deadlines in one connected system.

Master shop calendar, machine schedules, project timelines, staffing visibility, and cross-project production tracking. The whole shop stays aligned without whiteboards, clipboards, spreadsheets, or constant schedule rebuilds.

  • Master shop calendar
  • Machine and equipment schedules
  • Project-level scheduling
  • Staff capacity planning
  • Cross-project production tracking
  • Live schedule updates
Week of Apr 21
Live schedule
Mon
Tue
Wed
Thu
Fri
CNC Router #1
ADM
ADM
WLK
BRN
CNC Router #2
HTN!
HTN
ADM
ADM
R. Torres
ADM
WLK
HTN
BRN
Selected Job
Adams Kitchen · Cut Stage · Due Apr 24 · R. Torres
On trackCNC Router #1

Why Traditional Scheduling Breaks

Most shops don't actually run on a connected scheduling system. They run on spreadsheets, paper packets, whiteboards, memory, verbal coordination, and one experienced employee holding everything together.

1

Due dates live in emails, machine availability is on a whiteboard, staffing changes are discussed verbally, and job status sits in one experienced employee's memory. Nobody has the full picture and nothing is connected.

Information lives in too many places.

2

A rush job, a machine breakdown, a sick operator, or a delayed shipment forces the whole shop to manually rebuild the schedule and re-communicate the changes. Every disruption turns into a coordination tax paid in real production time.

Every change creates manual coordination.

3

Without connected machine schedules, staffing schedules, and project timelines, shops promise dates they cannot keep. Capacity is a guess, deadlines slip, and customers find out late.

Shops commit without real visibility.

"I confirmed a rush job on Thursday for Monday delivery, then realized my router was already committed through Tuesday and my best operator was on vacation."Owner, 6-person CNC shop

How OpenSpindle Works

A connected operational scheduling system for the whole shop, not a calendar bolted on top.

Step 1See the entire shop in one place

Master shop calendar, project schedules, machine schedules, staffing schedules, and live production tracking in one connected view. No more flipping between spreadsheets, whiteboards, and the back of a job folder.

Step 2Schedule against real capacity

Schedule jobs against actual machine availability, operator availability, maintenance windows, deadlines, and active workload. The system shows what your shop can really take on before you promise a date.

Step 3Track work across every project

The master production tracker gives every supervisor and owner real-time visibility into what is running, what is blocked, what is behind, and what is due next, all from one screen.

Step 4Adjust once, update everywhere

Move a job, swap an operator, or change a due date and the update propagates across the master calendar, machine schedules, project timelines, and production tracker in real time. No rebuild. No re-publish.

What This Gets You

No matter what level you need to manage the shop from, OpenSpindle gives you visibility and control.

One operational source of truth

The master calendar, machine schedules, project timelines, and production tracker all point at the same data. The shop stops running on parallel systems that disagree with each other.

Less dependency on tribal knowledge

When the schedule, capacity, and active work are visible to everyone, the shop no longer depends on one person to know what is going on. Knowledge lives in the system, not in someone's head.

Real production transparency

Owners, supervisors, and operators all see the same live picture of what is running, what is on deck, and where work is stuck. No status meetings to find out what the floor already knows.

Better customer commitments

Quote and confirm dates against actual machine and staff capacity. Stop overcommitting because the schedule was a guess.

Faster response to operational change

A rush job, a machine down, or a staffing change updates the schedule in seconds and everyone sees the new state. Disruption stops cascading into days of manual coordination.

Improved visibility across the entire shop

No matter what level you need to manage the shop from, OpenSpindle gives you visibility and control. Owner, manager, scheduler, supervisor, or floor lead.

Everything Included

Connected operational tools for the way CNC and fabrication shops actually run.

Master Shop Calendar

A single shop-wide calendar that ties every project, machine, and person together. The whole operation in one view, updated live.

Machine and Equipment Scheduling

Schedule jobs against machine availability, maintenance windows, and active workload. Equipment never gets double-booked and downtime is visible before you commit.

Project Scheduling

Project-level timelines that roll up from individual job stages. See where every project sits, what it depends on, and what it is waiting for.

Staff Scheduling and Capacity

Live operator and supervisor capacity across the week. Schedule against real availability instead of guessing whether someone is free.

Master Production Tracker

Cross-project production visibility for owners and supervisors. See what is running, what is blocked, what is behind, and what is due next without walking the floor.

Live Schedule Propagation

Every change moves through the system in real time. Update once and the master calendar, machine schedule, project timeline, and production tracker all reflect the new reality immediately.

Shop Workflows Covered

Weekly schedule build
Pull every open job, assign to machines and operators, review capacity, and publish to the shop floor in one session instead of spending a morning in spreadsheets and on the whiteboard.
Rush job insertion
Add a new priority job to the live schedule, see exactly what it displaces across machines and staff, and make adjustments in real time before confirming the date.
Staff absence coverage
Remove a team member from the schedule and immediately see which jobs need reassignment, with available capacity shown for each alternative across the rest of the shop.

Frequently Asked Questions

OpenSpindle is not a standalone calendar tool. It is a connected operational system that links the master shop calendar, machine and equipment schedules, project timelines, staff capacity, and live production tracking into a single source of truth. Generic scheduling apps were not built for the way CNC and fabrication shops run, where a machine breakdown or sick operator cascades across every other job on the board.

Yes. Move a job, swap an operator, or change a due date and the change propagates across the master calendar, machine schedule, project timeline, and production tracker immediately. There is no publish step, no manual rebuild, and no morning meeting required to get everyone onto the new plan.

Yes. The machine and equipment scheduling view shows current and upcoming machine availability alongside maintenance windows and active workload. Before you commit to a date, you can check whether the router or press or lathe you need is actually free for the hours required. This replaces the guesswork that causes shops to overpromise and underdeliver.

You add the new priority job to the live schedule and the system shows you exactly what it displaces across machines and staff. You can see which jobs need to move, where available capacity exists in the rest of the shop, and make adjustments in real time before confirming the delivery date with the customer.

Yes. The staff scheduling view shows live availability for each operator and supervisor across the week. If someone is out, on a specific job, or approaching overtime, that shows in the capacity view before you assign them to another task. You schedule against actual individual availability rather than assuming a headcount number translates to real output.

The master production tracker is a cross-project visibility view for owners and supervisors that shows what is currently running, what is blocked, what is behind schedule, and what is due next, all from one screen. It is updated live from the floor so there is no need to walk stations or hold a status meeting to understand where every active job stands.

You can during the transition, but most shops phase them out within a few weeks. Once the team sees the same schedule update in real time across machines, staff, and projects, maintaining a parallel whiteboard starts to feel like double work. OpenSpindle is built to replace those workarounds rather than add another system to the stack.

Scheduled jobs feed directly into production runs so the priority order set in the schedule matches the queue the floor sees on the display. When you update a job's position in the schedule, that change flows through to the production run and shows up on the floor display without any manual steps in between.

You log the downtime against the machine in the equipment module and the schedule view immediately shows which jobs are affected. You can reassign work to alternative machines, shift due dates, or rebalance operator assignments, and every downstream project and timeline updates to reflect the new state. What used to take a morning of phone calls and whiteboard redraws takes minutes.

When you can see real machine availability, current operator load, and active project timelines before you confirm a date, you stop guessing. You quote based on what your shop can actually produce and when, which reduces missed deadlines, rebuilds customer trust, and eliminates the stressful last-minute scramble that comes from promising dates against a schedule that only exists in someone's head.

Stop Running Your Shop on Whiteboards and Workarounds

OpenSpindle replaces disconnected scheduling systems with one connected operational platform for CNC and fabrication shops. From machine schedules to project timelines to production tracking, everything stays visible, aligned, and up to date.